Jireh Building

Design of a new 9,400 sf office and retail center in Waterville is nearly completed. Spring construction is scheduled. A doctor's office will occupy 3,500 sf of the building consisting of a partial open layout and private areas where required. The remaining space is available for future tenants.  A complete design package was provided, with construction services anticipated.

Toledo Lucas County Public Library

Services included inspection of 15 libraries, evaluating existing conditions of drainage systems, pavements, walks, and sites. A master plan was prepared detailing costs and priorities for maintenance, replacement, and improvements to each site. The plan is currently used by the Toledo Lucas County Library sytem for future expenditures and planning.

Pioneer Hi-Bred

Construction has been completed on a new 4,000 gallon per day, commercial wastewater treatment facility. The system consists of two 5,000 septic tanks connected in series, followed by a stage 1 Orenco AX-Max package plant. Discharge is onsite by means of a 2,000 lineal foot chamber, dosed, leach field. Design incorporates flexibility to install a Stage 2 treatment module, and uv disinfection. This will allow future offsite discharge. Services included complete design, securing the EPA permit, bidding, and periodic construction inspections. The treatment system is one of the largest on-site systems in northwest Ohio.

Contact Us

Cappelletty Engineering
6145 Douglas Rd
Toledo, OH 43613

 

Phone: 419 475-8200

Fax: 419 475-8200

Email: mike@cappellettyengineering.com

Questions?

Call 419 475-8200 or use our contact form.

Current Projects

Click here to find out what projects we are currently working on.

Get Social With Us

Print | Sitemap
© Cappelletty Engineering